Categories
South Caucasus News

Feasibility study deadline of “green corridor” project from Azerbaijan to Europe set


The feasibility assessment for the “green corridor” project, which comprises running a cable under the Black Sea from Azerbaijan to Europe, is planned to be finished in July 2024, World Bank Regional Director for the South Caucasus Rolande Pryce said, according to Azerbaijan in Focus, reporting Trend.

Pryce said this during an “Enhancing Connectivity: European Connectivity (Renewable Energy and Digital Connectivity) Middle Corridor (Reshaping Euro-Asia Connectivity)” panel discussion at the 57th ADB Annual Meeting in Tbilisi.

The post Feasibility study deadline of “green corridor” project from Azerbaijan to Europe set appeared first on Azerbaijan In Focus.