We have no territorial claims to Zangazur, the Chairman of the Center of Analysis of International Relations (AIR Center), Farid Shafiyev, said at the press conference on the AIR Center’s results in 2023, Report informs.
The New Voice Of Urraine: A second group of Russian occupiers from the 71st regiment of the Russian Armed Forces surrendered on the Zaporizhzhya front, reporting mistreatment by the Russian command and significant losses, OC West Telegram channel reported on Dec. 27.
Russian military personnel spoke out about…
РБК: The AN-24 aircraft of Polar Airlines with 30 passengers on board landed on a frozen river in Yakutia near the runway of Zyryanka Airport in Yakutia. In addition to the passengers, there were four crew members on board.
According to the regional operational headquarters, the plane was flying…
Russian company Lukoil Absheron Exploration Limited has announced the closure of its representative office in Azerbaijan, according to Azerbaijan in Focus, reporting Trend.
According to the State Tax Service under the Ministry of Economy of Azerbaijan, the official representative of the company (date of state registration in Azerbaijan – 29.11.2021) is Elnur Gurbanov.
Creditors can submit their claims within two months to the address: 13 Zeynalabdin Taghiyev street, Sabail district, Baku.
“Lukoil Absheron Exploration Limited” is a subsidiary of the Russian company “LUKOIL”.
The post Lukoil Absheron Exploration Limited shuts its branch in Azerbaijan appeared first on Azerbaijan In Focus.
Baku Shipyard LLC and Dutch Damen Shipyards Gorinchem B.V. have begun construction on the dredge vessel CSD 650, which is expected to be launched at the end of 2025, noted the Chairman of the Board of Baku Shipyard Elshad Nuriyev, according to Azerbaijan in Focus, reporting Trend.
According to Nuriyev, the customer of such a dredging vessel is Baku International Sea Trade Port CJSC.
“The construction of such a vessel is quite important. The presence of such vessels in the country is required to reduce the level of the Caspian Sea. For the first time, a vessel of this type will be built in Azerbaijan,” Nuriyev emphasized.
The work of the dredging vessel is aimed at creating conditions in the ports of Azerbaijan for them to be able to serve vessels with a draft of more than 6-8 meters, such as tankers of 8,000 tons operating in the Caspian Sea.
Due to the shoaling of the Caspian Sea, the process of receiving such vessels is currently facing difficulties, as the bottom of the Azerbaijani Caspian water area is now mostly hard clay, whereas before there was sand and light clay.
Therefore, modern dredging vessels are required, such as the CSD 650 type with a powerful shovel and other technological features.
Nuriyev also told Trend that the shipyard is building a tanker by order of SOCAR (the State Oil Company of the Republic of Azerbaijan), with the cost determined at $28.8 million; the shipyard also has an order for a ferry for the Azerbaijan Caspian Shipping Company.
“The enterprise has signed contracts, and orders are being formed and tanker orders concern an 8,000-ton and a 12,000-ton tanker,” the chairman said.
“We plan to fulfill the orders until 2030,” Nuriyev added.
A Memorandum of Cooperation was signed between Baku Shipyard and Damen Shipyards Gorinchem B.V. in June this year, and a construction contract was signed on October 12.
The post Terms of commissioning of Azerbaijan’s first dredging vessel disclosed appeared first on Azerbaijan In Focus.